Communication Tower Manufacturer

Nouvelles de la société

Maison Centre d'Information Nouvelles de la société

45 Meters 3 Legged Angle Steel Antenna Tower for Samoan Client Trial Assembly

45 Meters 3 Legged Angle Steel Antenna Tower for Samoan Client Trial Assembly
March 11, 2025

As shown in pictures is the trial assembly site of 45m 3 legged angle steel tower for our Samoan client. Trial assembly before hot-dip galvanization helps ensure that all components of the angle steel tower fit together correctly and align properly before galvanization. It allows for the identification of any discrepancies or issues in the assembly process that can be addressed and corrected before the final galvanization step. 

Ensuring proper fit and alignment through trial assembly before galvanization can contribute to the long-term durability and performance of the angle steel tower, reducing the risk of premature corrosion or structural issues.

3 leg angle steel tower


45m angle steel tower


3 leg angle steel tower


3 legged angle steel tower


angle steel telecom tower


 

 

Laisser un message

Laisser un message
Si vous êtes intéressé par nos produits et souhaitez en savoir plus, veuillez laisser un message ici, nous vous répondrons dès que possible.
Soumettre

Maison

Des produits

whatsapp

contact