45 Meters 3-Legged Angle Steel Telecom Tower Packaging Site before Shipment
The following pictures show the packaging site of the 45 Meters 3-Legged Angle Steel Telecom Tower before delivery. We use flannel to pack the angle steel parts at the beginning and end, and fix them with stainless steel binding tape. The remaining parts are connected in sequence with iron wire to prevent omission and confusion.