500kV Power Transmission Tower Trial Assembly before Hot-dip Galvanization
Today we completed the trial assembly of a 500kV power transmission tower before hot-dip galvanizing. Trial assembly has verified that all components are within the minimum tolerance range.
This type of tower is supplied to the State Grid Corporation of China, and the raw material testing, trial assembly, and hot-dip galvanizing all meet national standards.




